Why Bring In Your Interior Designer During Construction

When to hire an interior designer for a new home or villa in Bangalore: involving them during civil work avoids broken walls, re-wiring and lost ceiling height.

The Unique Story design team · 18 October 2026 · 2 min read

Double-height villa hall with a curved staircase and the dining area beyond
Staircase, dining and ceiling planned together in a villa at Astro Green Park Regency

Short answer: bring your interior designer in while the walls, electrical conduits and plumbing are still being laid. Changes at that stage are drawing changes. After handover they become breaking, re-plastering and re-painting.

The cost of deciding late

Builders place switches, AC drains and plumbing points to a standard layout. Once your furniture plan is ready, many of those points are in the wrong place: a switchboard behind the bed, a drain line through a wall you wanted for a wardrobe, a light point where the dining table cannot go. Moving them later means cutting finished walls and floors.

What early design changes

Construction stageWhat the designer settlesWhat it avoids later
BrickworkDoor positions and swings, wardrobe depths, wall nichesBreaking new walls or settling for shallow wardrobes
Electrical conduitsSwitch and socket positions matched to the furniture plan; pendant and sconce pointsChased walls, visible wiring, extension boards
AC and plumbingDrain routes, concealed pipes, ceiling space for ducts and curtain tracksExposed pipes, lower ceilings
Flooring and ceilingsLevels, thresholds, cove detailsUneven transitions, re-laid flooring
Villa living room with a timber staircase, a swing seat and a wall-mounted TV unit
TV wall, staircase and seating designed around the structure of a villa at Gauribidanur

For villas, it matters even more

In an independent home, the interior and the structure can be designed together: double-height volumes, staircases, skylights and built-in furniture. Decisions about where the pooja room, wardrobes and kitchen go shape the walls themselves.

Working with your architect and builder

Your interior designer should work alongside your architect and site engineer, sharing drawings for electrical, plumbing and ceiling layouts before each stage starts. Ask for a short list of the drawings you will receive, and when.

When to call

For a villa: at the design stage, or as soon as the structure is up. For an apartment under construction: as soon as the builder allows customisation, often before brickwork or electrical work is final. If you are at that stage, bring your plans to the studio and we will tell you what to fix now.